| Footings |
Kitchen Hood/Flue |
Masonry Walls |
Irrigation Systems |
| Piers |
Insulation |
Structural Slab |
Fences |
| Concrete Walls |
Drywall |
Steele |
Swimming Pools |
| Groundwork Plumbing |
Gas Pressure Test |
Elevator Shaft |
| Groundwork Electric |
Electric Service (Permanent) |
Sand Trap |
| Storm Drain (tied to roof drain) |
Sewer |
Fire Sprinkler System |
| Grease Trap/Interceptor |
Sidewalk |
Fuel Tank |
| Final/Occupancy |
Rough Plumbing; Electrical; HVAC (including above ceiling) |
| Driveway |
Rough-in Structural |
When the project is completed and prior to inspection, disposal of all scrap and debris is required.